Near Shore Testing

February 2015

Zyba deploys a large scale CCell device in Cumbria.

The first offshore trials of CCell are undertaken in Cumbria, with the experiment concluding six months of work to optimise manufacturing, installation and operation of a steel device at a near shore location.

Power was extracted through a hydraulic system with onshore controls.

CCell in Cumbria
CCell in Cumbria
Email Facebook LinkedIn Twitter